General Terms and Conditions – gastroprocessor.com
Warranty and commercial terms of FTP Engineering s.r.o. for the online shop www.gastroprocessor.com.
Version: October 2026 | Supersedes all previous versions | This English version is the governing version of these GTC (Art. 17.3).
0. Precedence clause (supremacy of the Supplier’s terms)
0.1. Any quotation issued by FTP Engineering s.r.o. constitutes an offer to conclude a contract governed exclusively by these General Terms and Conditions (the “GTC”). Payment of an invoice (in full or in part) by the Customer, or any other commencement of performance by FTP Engineering s.r.o., constitutes full and unconditional acceptance of that offer without any changes. The contract is deemed concluded exclusively on the terms set out in the quotation and in these GTC. The same applies to an order submitted and paid through the website www.gastroprocessor.com.
0.2. These GTC take precedence over and replace any general or special purchasing terms of the Customer, regardless of their form or designation. Any conflicting terms of the Customer are hereby rejected and do not become part of the contract, whether contained in an order, order confirmation, delivery note, correspondence, standard forms, small print or any other document, even if FTP Engineering s.r.o. did not expressly object to them and even if it subsequently issued an invoice or accepted payment. Acceptance of payment, performance of delivery or any other conduct of FTP Engineering s.r.o. shall not be construed as acceptance of the Customer’s terms.
0.3. The Customer’s terms become valid only if they are reproduced verbatim in the Supplier’s quotation and confirmed by the signature and stamp of an authorised representative of the Supplier. No amendment, supplement or waiver of these GTC is valid unless made by a separate written agreement that expressly refers to the provision being amended, signed by an authorised representative of FTP Engineering s.r.o. and bearing the company stamp.
0.4. Exclusivity of terms. FTP Engineering s.r.o. does business exclusively on the basis of these GTC, or on the basis of a separate, fully executed individual contract signed and stamped by both parties which expressly states which specific provisions of the GTC are amended. The Supplier does not do business on “mixed” terms through correspondence or on the basis of separately agreed partial deviations. Unless such an individual contract is signed, the Supplier delivers exclusively under these GTC.
1. Introductory provisions and definitions
1.1 Definitions
1.1.1. The Supplier is FTP Engineering s.r.o., with its registered office at Pezinská 5104, 901 01 Malacky, Slovakia, company ID (IČO): 35977558, registered in the Commercial Register of the District Court Bratislava III, section: Sro, file no. 39276/B.
1.1.2. The Customer is the entity that has accepted the Supplier’s quotation and has thereby become a party to a purchase contract / contract for work with the Supplier.
1.1.3. A Quotation is the Supplier’s offer to conclude a contract, prepared on the basis of the Customer’s requirements; these GTC are an integral part of the Quotation. The Complaints Procedure is a separate document forming part of the GTC.
1.1.4. Acceptance means acceptance of the Quotation by the Customer: (i) by delivery of a confirming e-mail to the Supplier’s address, and/or (ii) by payment of the price under Art. 6.2.1 of these GTC, and/or (iii) by submitting and paying an order through the website www.gastroprocessor.com; for this purpose the offer of products on that website is regarded as a Quotation.
1.1.5. The Contract is the Quotation confirmed by Acceptance during the validity period of the Quotation.
1.1.6. GTC means these general terms and conditions. By accepting the Quotation, the Customer confirms that it has read these GTC and agrees with them in full. When ordering through the website www.gastroprocessor.com, the Customer expressly confirms, before submitting the order, its agreement with these GTC and that it has read the Privacy Policy (Art. 18b).
1.1.7. The Product or subject of delivery is the resulting product to be delivered under the Contract.
1.1.8. Source Documents are any technical materials and information on the basis of which the Supplier delivers the Product and which are binding on the Customer.
1.1.9. Technical Documentation includes any accompanying technical documentation necessary for the proper use of the Product.
1.1.10. New Concept (prototype) means a product that is not part of the Supplier’s existing range, made expressly at the request and on the basis of documents of the Customer, or a series product which the Customer requires to be modified.
1.2 Introductory provisions
1.2.1. The Quotation is valid for two months from its delivery to the Customer. The Supplier may withdraw the Quotation without giving a reason.
1.2.2. The Contract is deemed concluded upon Acceptance by the Customer. If the Acceptance contains additions, restrictions or other changes, it constitutes a rejection of the offer and a counter-offer.
1.2.3. These GTC form part of the Contract. Any arrangements deviating from these GTC are binding only if expressly agreed in the Contract. Withdrawal from the Contract is possible only by delivery in accordance with Art. 19.1 of the GTC.
1.2.4. If any provision of these GTC is or becomes invalid, the parties shall jointly seek a new arrangement that is as close as possible in legal and economic terms. The invalidity of an individual provision does not affect the validity of the remaining provisions; this applies in particular to the provisions of Section 0 (precedence clause), which remain in force independently of the other provisions.
1.2.5. Conclusion of the Contract replaces and cancels any previous oral or written arrangements between the parties.
1.2.6. Any commercial offers that do not have the nature of a binding Quotation are not binding. All photographs, drawings and diagrams are illustrative.
1.2.7. The Supplier reserves the right to correct typographical errors and obvious errors in prices, technical data and descriptions on the website and in other materials, and to make technical and price changes without prior notice. A contract concluded at an obviously incorrect price does not oblige the Supplier to deliver at that price; the Supplier may withdraw from it and refund any payment received.
1.3 Classification of the contract (type of transaction): Section 409 / Section 536 of the Commercial Code
1.3.1. The type of contract between the Supplier and the Customer is determined automatically according to the nature of the subject of delivery in accordance with the criteria below, regardless of the designation used by the parties in correspondence or documents.
1.3.2. If the Customer acquires a standard series product from the Supplier’s existing range without any changes, additions or individual requirements, the transaction is classified as a purchase contract within the meaning of Section 409 et seq. of the Commercial Code.
1.3.3. If the Customer requires any change or addition to the Product, or orders a product to be made according to its own parameters, specification or requirements, the transaction is automatically and in its entirety classified as a contract for work within the meaning of Section 536 et seq. of the Commercial Code. A single individual requirement of the Customer is sufficient for such classification; the parties’ consent to the change of contract type is not required.
1.3.4. In case of doubt, or if a single order shows features of both types, the transaction is deemed a contract for work as a whole.
2. Subject of delivery
2.1. The subject of delivery is defined in the Quotation. The Supplier reserves the right to make changes to technical specifications, configuration and design that do not impair the performance characteristics of the Product, without prior notice. Such changes do not constitute a defect.
2.2. The delivery does not include construction work, supply of utilities, unloading of machines, food raw materials, or any machines and services not expressly stated in the Contract.
2.3. The Supplier does not guarantee compatibility between the Product and equipment procured separately by the Customer.
2.4. The choice of components and technical solutions not expressly specified in the Contract is at the Supplier’s discretion.
2.5. For series products from the Supplier’s range, the Supplier carries out a risk analysis to the extent required of it as manufacturer by applicable law (in particular in connection with conformity assessment and CE marking under Directive 2006/42/EC). For prototype, custom-designed or modified equipment, the Supplier is not obliged to carry out an analysis of the risks associated with its use, since completion and final conformity assessment are as a rule ensured by the Customer; at the Customer’s request this is a separate paid service.
2.6. For series products, the Supplier provides a declaration of noise emissions to the extent required by applicable law. For prototype or modified equipment, the Supplier is not obliged to provide a noise test; at the Customer’s request this is a separate paid service.
2.7. If any part of the production process originates from the Customer or was designed by it, the Supplier bears no responsibility for the result. Any necessary tests or changes will be charged at actual cost plus a margin of at least 10%.
2.8. Know-how relating to the Supplier’s production processes and technologies is not part of the delivery.
2.9. Preparation of the commercial Quotation itself is free of charge. However, if at the Customer’s request the Supplier carries out individual design and engineering work (in particular design calculations, proposals, drawings, 3D models or other preparatory work on a prototype) which was agreed in writing in advance as paid, the Customer is obliged to pay the price of that work regardless of whether a Contract is subsequently concluded. In such a case the remuneration relates to the design and engineering work performed, not to the submission of the Quotation itself.
2.10. Prototype, custom-designed or modified equipment is regarded as a non-series development project. The agreed price reflects the increased engineering scope, technical complexity and implementation risks.
2.10a. Only expressly recorded parameters are guaranteed. For a prototype, the equipment guarantees exclusively compliance with those parameters and indicators which are material to the Customer and which are expressly stated as guaranteed in the Quotation and/or the Contract. Any other parameters, expectations or results not fixed in writing as guaranteed are not covered by the warranty.
2.10b. A change at the Customer’s request automatically makes the product a prototype. Any equipment to which changes or additions not envisaged by the original design have been made at the Customer’s request is automatically regarded as a prototype. From the moment such a change is made, the provisions on prototypes apply to the product in full.
2.10c. The making of such changes is a ground for reassessing the price, the deadline and the scope of warranties.
2.10d. Definition of a “material change”. A material change is any change to the Customer’s requirements or source data that is not a pre-agreed option or configuration choice included in the Quotation. A material change concerns in particular: (a) the design; (b) materials; (c) performance parameters; (d) the scope of delivery; or (e) the deadline. Any change that is not an option expressly stated in the Quotation is a material change regardless of its extent. This definition applies uniformly to the prototype regime (Art. 2.10b), to the recalculation of the deadline (Art. 9.5) and to the reset mechanism (Art. 2.12).
2.11. Any additional changes requested after approval of the Technical Documentation are subject to separate pricing.
2.12 Change of requirements and reset
2.12.1. Any change to source data or requirements (before or after conclusion of the Contract) is carried out only after separate payment for the development/redesign work. Work does not begin until payment is made; the previous configuration and deadlines are maintained or suspended.
2.12.2. If the Supplier has already started work, a material change (Art. 2.10d) results in a reset: the previous stages, calculations, deadlines and arrangements relating to the affected part are cancelled and the work starts anew, including the running of deadlines.
2.12.3. The Supplier undertakes in good faith to reuse, to the maximum technically possible and practical extent, the work, solutions and materials of the previous version already completed.
2.13 Distinction between equipment and technology
2.13.1. The subject of delivery is equipment, not a technology, recipe or technological procedure for processing the Customer’s specific product. The Supplier guarantees exclusively the technical parameters of the equipment itself (mechanically calculable design and performance parameters of the machine) expressly stated as guaranteed in the Quotation and/or the Contract. The Supplier does not guarantee and is not responsible for the technological result of the process achieved on the Customer’s product (including in particular: output on a specific raw material, processing time, temperature and condition of the product at the outlet, quality of the final product), unless development of the technology for the specific product was expressly included in the subject of delivery and paid for separately.
2.13.2. The technological parameters of the process, the properties of the raw material and the requirements for the final result are the Customer’s source data. The Supplier designs and manufactures the equipment on the basis of these data and is entitled to rely on their completeness and accuracy (Art. 3.1).
2.13.3. Any indicators dependent on the properties of the Customer’s specific product can be confirmed and guaranteed exclusively on the basis of the results of tests on the Customer’s real product. Such tests are a separate paid service borne by the Customer. In the absence of completed and paid tests on the product, the Supplier guarantees only the mechanically calculable parameters of the equipment expressly stated as guaranteed in the Quotation and/or the Contract.
2.13.4. Development of a technology or processing regime for the Customer’s specific product is a separate paid service and is concluded by a separate agreement.
3. Source Documents and Technical Documentation
3.1. By providing Source Documents to the Supplier, the Customer confirms that the Supplier may rely on their accuracy and completeness.
3.2. If the Source Documents are factually incorrect or incomplete, the Customer must provide correct documents without undue delay; the delivery period is suspended until then.
3.3. If the Source Documents make delivery impossible, the Supplier is entitled to withdraw from the Contract and is entitled to compensation for costs and damage, including lost profit.
3.4. Both parties remain the owners of the technical documents they have provided to each other. Neither party shall disclose these documents to third parties without prior consent.
3.5. Any further documentation beyond the subject of delivery will be prepared only if the Customer pays the related costs.
4. Legal standards applicable in the country of destination
4.1. Unless otherwise agreed, production will comply with the legal regulations and the technical and safety standards applicable at the Supplier’s place of business. Compliance with regulations in the country of destination must be expressly agreed and form part of the Source Documents.
4.2. The Customer’s technical and regulatory requirements for the country of destination must be confirmed in writing and form part of the Contract or its annex before production begins. The Customer shall indemnify the Supplier and hold it harmless against any claims, fines, penalties or damage arising from the Customer’s failure to provide accurate, complete and timely legal, safety or technical requirements applicable at the place of destination.
5. Prices
5.1. Unless otherwise agreed, all prices are Ex Works (EXW) Malacky, Slovakia, under Incoterms 2020, stated in euros. The price does not include transport, insurance, packaging, export/import duties, taxes or product certification costs.
5.2. Packaging costs will be charged separately and packaging materials are not returnable.
5.3. Two-step mechanism for cost increases. If, after conclusion of the Contract, labour costs or prices of input raw materials rise by more than 8% compared with the level at the date of the Quotation as a result of changes in the materials or labour market, the Supplier is entitled to request a price adjustment. (i) As a first step, the parties negotiate a proportionate price adjustment. (ii) If the Customer does not accept the adjustment, the Supplier is entitled to withdraw from the Contract with compensation for the costs incurred up to the moment of withdrawal.
5.4. The Customer is obliged to pay for the preparation of documentation that is required but not expressly stated in the Quotation.
5.5. The Customer is obliged to reimburse all costs associated with permits, certificates, measurements and analyses required for the subject of delivery.
6. Payment terms
6.1. Payments are made to the bank account designated by the Supplier or through the payment gateway on the website www.gastroprocessor.com.
6.2. Unless otherwise agreed, payments are made as follows:
6.2.1. 100% of the price is paid in advance as part of the Acceptance: for an order through the website www.gastroprocessor.com via the payment gateway on the website, in other cases by bank transfer on the basis of the Supplier’s advance invoice submitted together with the Quotation.
6.3. The obligation to pay is deemed fulfilled on the day the funds are credited to the Supplier’s account.
6.4. Fees associated with the transfer of funds are borne by the Customer.
6.5. If the Supplier has justified concerns that its receivables will not be paid, it is entitled to suspend performance or retain the Product until sufficient security is provided.
6.6. If the Customer is in default with payment of a monetary obligation, it is obliged to pay default interest from the day following the due date at a rate of at least 4% above the 3-month EURIBOR rate applicable at the time the default arose. The right to full compensation for damage is not affected.
6.7. Settlement upon withdrawal by the Customer. In the event of the Customer’s withdrawal from the Contract under Art. 13.1, refusal to take over the Product or termination of the project at the Customer’s initiative, the Customer is obliged to reimburse the Supplier for all actual costs associated with the project, including in particular: the price of materials purchased and ordered; work performed on development, calculations, design and production preparation; production stages already completed; overheads; as well as lost profit. The advance paid is set off against these costs. If the amount of actual costs exceeds the advance received, the Customer is obliged to pay the difference within 14 days. Only the part of the advance exceeding the amount of actual costs, if any, is refundable.
6.8. The Customer is not entitled to unilateral set-off or retention of payments, except where the Supplier is declared bankrupt or enters restructuring.
6.9. Any unpaid part of the price becomes immediately due if: (a) the Customer is in default with any obligation; (b) bankruptcy proceedings have been initiated against the Customer; (c) a lien has been established on the Customer’s assets; (d) the Customer has entered liquidation; (e) the Customer, being a natural person, has died or filed for personal bankruptcy.
6.10. The Supplier is entitled to set off against its obligations towards the Customer also receivables of third parties personally or financially connected with the Customer.
6.11. If the Supplier is forced to enforce its receivables in court proceedings, all costs are borne by the Customer.
7. Retention of title
7.1. The Supplier remains the owner of the Product until the price is paid in full. During this period the Customer shall ensure proper storage and insurance of the Product in favour of the Supplier.
7.2. Retention of title also applies where the Customer has not paid any ancillary prices, damages, contractual penalties, interest or legal costs.
7.3. As long as the Product is subject to retention of title, the Customer is not entitled to encumber or dispose of the Product otherwise than in the ordinary course of business.
7.4. If the Supplier exercises its right under the retention of title, it is entitled to take possession of the Product and the Customer shall provide all necessary cooperation.
7.5. The Supplier has a right of retention in relation to any movable property of the Customer which it has at its disposal on any legal ground.
7.6. Retention of title remains in force if the Customer fails to fulfil its obligations under any subsequently concluded separate arrangements relating to the Product.
8. Intellectual property rights and confidential information
8.1. If the Product includes any copyright work or subject of industrial property (e.g. software), the Supplier grants the Customer the right to use that work exclusively for the proper use of the Product. The Customer is not entitled to transfer this right to third parties or to grant sublicenses. All rights to the technical documentation, drawings, design proposals and 3D models of the Product remain permanently and exclusively with the Supplier; the Customer acquires no ownership or license rights to them and is not entitled to copy them, disclose them to third parties or use them to manufacture or modify equipment.
8.2. The Supplier retains all rights to the know-how, production processes, technologies and software used in the manufacture of the Product (“Confidential Information”). The Customer is obliged to maintain strict confidentiality. A contractual penalty of EUR 25,000 applies to each breach.
8.3. The duty of confidentiality also applies to information about the Supplier’s customers, employees, technical procedures and pricing policy. The Customer may not publish photographs or videos of products delivered by the Supplier without its consent. A contractual penalty of EUR 25,000 applies to each breach.
8.4. If the Customer holds any carriers of Confidential Information that are not necessary for proper use, they must be returned on request. A penalty of EUR 1,000 applies for each day of delay.
8.5. The Customer shall protect Confidential Information to at least the same extent as its own. Access is limited to personnel who strictly need it.
8.6. The duty of confidentiality does not apply to information which the Customer is required by law to provide to public authorities.
8.7. The duty of confidentiality remains in force after performance or termination of the Contract.
9. Delivery period
9.1. The Customer acknowledges that the delivery period stated in the Contract (Quotation) is indicative.
9.2. In determining the delivery period, the Supplier relies on the circumstances known at the time the Contract is concluded.
9.3. The delivery period begins on the day the payment under Art. 6.2.1 is credited to the Supplier’s account, but does not begin until all formal prerequisites for delivery are met.
9.4. Compliance with the delivery period depends on the Customer’s proper fulfilment of its contractual obligations and provision of all necessary cooperation.
9.5. The delivery period is extended appropriately if: (a) the Source Documents were not provided on time or were subsequently changed; or (b) events of force majeure occur (epidemics, war, labour disputes, delayed deliveries of raw materials, natural disasters, interventions by state authorities, etc.); or (c) the Customer or a third party is in default with its obligations. In the event of a material change (Art. 2.10d) to the source data or requirements by the Customer, the delivery period is not extended but is calculated anew from the date of written approval of and payment for the change in accordance with Art. 2.12 (reset upon changes).
9.6. Compensation for delay shall not exceed 0.5% of the Contract price per week and a maximum of 5% of the Contract price in total. No compensation is provided for the first two weeks of delay.
10. Transfer of risk
10.1. Delivery of the Product is on an Ex Works basis (EXW Malacky, Slovakia) under Incoterms 2020. The risk of damage passes to the Customer at the moment it is enabled to take over the Product at the Supplier’s place of business. The Supplier will notify the Customer of the readiness date in advance. The delivery term EXW Malacky applies regardless of the classification of the Contract under Art. 1.3; even in the case of a contract for work (prototype), the entire risk of damage passes under Incoterms EXW and not under the default rules of the Commercial Code on the place and manner of handover of the work (Section 554).
10.2. The Supplier is not obliged to hand over the Product and is not in default until full payment under Art. 6.2 of the GTC has been received.
10.3. The Customer bears the risk of damage to a Product at its premises that is to be replaced until the original Product is back in the Supplier’s possession.
10.4. The risk of damage to a Product that is the subject of installation at the Customer’s premises is always borne by the Customer.
10.5. Promotion: free transport within the EU. For deliveries to Member States of the European Union, the Supplier, as a promotion, orders transport of the Product by a courier service at its own expense. The delivery term EXW Malacky is not affected: the risk of damage passes to the Customer under Art. 10.1, the transport is performed by the courier service, and the Supplier is not liable for damage to, loss of or delay of the consignment during transport. For deliveries outside the EU, transport is agreed individually on the basis of an inquiry. The Supplier may change or end the promotion at any time; this does not affect contracts already concluded.
11. Acceptance procedure and inspection of the Product
11.1. The Supplier is obliged to inform the Customer that the Product is ready for handover. The Customer is obliged to take over the Product within 14 days of that notice. If the Customer does not do so, the Product will be stored at the Customer’s cost and risk, and after a further 30 days the Supplier is entitled to withdraw from the Contract and sell the Product to a third party; Art. 6.7 applies to the settlement.
11.2. In view of the delivery term Ex Works (EXW Malacky), when taking over the Product the Customer signs only a confirmation of receipt (or a transport document confirming acceptance for carriage); no separate handover protocol is drawn up. The Customer is obliged to inspect the Product upon takeover, in particular the integrity of the packaging, the quantity and any apparent defects, and to notify the Supplier of them in writing immediately, at the latest within 48 hours of takeover. Later claims for apparent defects or incorrect quantity will not be accepted. The Customer is entitled to refuse takeover only if the defects clearly prevent proper use.
11.3. Insufficient cooperation in taking over the Product does not affect the transfer of risk.
11.3a. Damage caused during transport is claimed by the Customer from the carrier. The Customer shall check the consignment in the presence of the courier, record any damage in the carrier’s transport document, take photographs and notify the Supplier within the period under Art. 11.2. Damage caused during transport is not a defect for which the Supplier is liable (Art. 10.5).
11.4. Product tests. The Supplier carries out its own production inspection of the Product’s conformity with the requirements it is obliged to meet. This inspection is included in the price, is carried out by the Supplier independently and does not require the Customer’s participation; the Supplier is not obliged to give the Customer access to it or to report on its progress. Acceptance tests with the Customer’s participation are carried out only if separately agreed and paid for. In the basic version such tests include exclusively dry or water tests, without oil and without the Customer’s specific raw material. Tests on the Customer’s real product are carried out only if all of the following conditions are met: separate payment for such tests; provision of the Customer’s own material; payment for design changes associated with the switch to working with that product, if needed.
12. Warranty and liability for defects
12.1. The warranty period is twelve (12) months. For systems in continuous operation, the warranty period is six (6) months. The warranty period begins at the moment the risk of damage to the Product passes to the Customer.
12.2. The Customer is obliged to notify the Supplier in writing of any defect without undue delay after discovering it.
12.3. Complaints must be submitted in writing (Art. 19.1 of the GTC) with all information necessary to assess the claim, including photographic and video documentation.
12.3a. A warranty claim must state the type and serial number of the Product, the number and date of the invoice under which it was purchased, the date of commissioning and a description of the defect and how it manifests itself. A claim without these details is not deemed submitted.
12.4. In the case of a justified complaint, the Supplier will remove the defects without undue delay and the Customer shall enable it to do so.
12.5. Original defective parts or materials that have been replaced become the property of the Supplier.
12.6. Complaints are handled exclusively at the Supplier’s registered office (plant) in Malacky. The Customer is obliged to send the Product, its part or component under complaint to the Supplier’s plant for inspection, at its own cost and risk and properly packed, and to collect it after the complaint has been handled. The Supplier does not inspect or repair the Product at the Customer’s premises, except under Art. 12.6a. The Supplier bears the costs of the actual removal of defects covered by the warranty carried out at its plant. Costs associated with transport, customs procedures, import/export duties and taxes incurred in connection with the transport of the Product or parts for inspection or repair and back are borne by the Customer. If the complaint is found unjustified, the Customer also pays the costs of the inspection.
12.6a. If, on the basis of a separate written agreement, the Supplier exceptionally undertakes to remove a defect at the Customer’s premises, the Customer bears: (a) the costs of transporting spare parts and materials; (b) the costs of dismantling and reassembly; (c) the travel, accommodation and subsistence costs of the Supplier’s personnel.
12.7. The Customer is not entitled to exercise rights arising from liability for defects if it is in default with the fulfilment of its obligations towards the Supplier.
12.8. The warranty does not cover defects caused by: normal wear and tear; improper use or lack of maintenance; unauthorized modifications or repairs; defective components supplied by the Customer; consumable parts, filters, seals; failure to follow the operating instructions; overloading; unsuitable materials; incorrect energy parameters; chemical or electrolytic agents; improper installation, connection or commissioning by a person not qualified for it; damage during transport after handover to the Customer or the carrier.
12.9. The warranty expires prematurely if the Customer or a third party carries out unauthorized modifications, or if the Customer does not enable the Supplier to remove the defect in time.
12.10. The provisions of Art. 12.2 to 12.8 also apply to any other claims arising from a breach of the Contract by the Supplier.
12.11. The Supplier is not liable for indirect damage, consequential damage, lost profit or loss of contract.
12.12. The Supplier warrants that the subject of delivery conforms to all technical specifications confirmed by the Customer in the Quotation. All conditions or warranties other than description, quality or fitness for a particular purpose are excluded to the fullest extent permitted by law.
12.13. If a defect concerns components expressly requested by the Customer, the Supplier’s liability is limited to the extent of the liability provided by those subcontractors.
12.14. The Supplier’s advice and recommendations regarding the use of the subject of delivery do not guarantee suitability for use with any specific product of the Customer, unless expressly agreed in writing.
12.15. The Supplier provides post-warranty service only at the Customer’s separate request and for separately agreed remuneration.
12.16. The Customer is not entitled to assign any rights arising from liability for defects to another person.
13. Termination of the Contract
13.1. In view of the nature of the Contract (purchase contract / contract for work), the Contract cannot be terminated unilaterally by notice; termination by notice does not apply. The contractual relationship may be ended exclusively by withdrawal from the Contract, and only in cases expressly provided for by these GTC or by mandatory provisions of the Commercial Code. Withdrawal must be in writing and takes effect on the day it is delivered to the other party under Art. 19.1. The consequences of withdrawal are governed by Art. 3.3, 5.3, 6.7, 13.2 and 13.3, depending on which party withdraws and for what reason.
13.2. After payment (including partial payment), the Customer is entitled to withdraw from the Contract in writing only if the delay in delivery caused by the Supplier exceeds 270 working days compared with the delivery period as adjusted under Art. 9.5. Delay caused by a change of source data, by the Customer’s conduct or by the circumstances under Art. 9.5 is not counted towards this period. In the event of such withdrawal, the Customer is obliged to reimburse the Supplier for the direct costs actually incurred up to the moment of withdrawal; the Supplier’s lost profit is not subject to compensation, since the reason is non-performance by the Supplier.
13.3. The Supplier has the right to cancel an order if the goods are no longer manufactured, if timely delivery is impossible due to force majeure, or if the price of the goods has changed substantially. If the Supplier cancels the order and the Customer has already paid, that amount will be refunded.
14. Exclusion of liability
14.1. The Customer’s claim for damages in no case includes: (a) consequential damage including loss of contract, lost profit, travel and transport costs; (b) damage to other property of the Customer or third parties; (c) damage caused intentionally or negligently by the Customer’s employees.
14.1a. In any event, the total aggregate liability of the Supplier towards the Customer arising out of or in connection with the Contract, whether in contract, tort or otherwise, shall not exceed the total Contract price. This limitation applies to all claims in aggregate, not per individual case.
14.2. The Supplier is not liable for damage to material provided by the Customer if the damage is a consequence of the defective nature of that material.
14.3. The Customer shall compensate the Supplier for all damage arising from any third-party claims based on liability for a defective product, where the Customer allows such third parties to use the Product.
15. Recourse
15.1. If, as a result of the conduct of the Customer, its personnel, representatives or entities entrusted with performing the Customer’s obligations, damage to property or persons occurs and a claim is brought against the Supplier on that ground, the Supplier has the right of recourse against the Customer.
16. Installation work
16.1. If the Contract includes installation at the Customer’s premises, the delivery periods begin only after the Customer has properly prepared the installation site and notified the Supplier of this in writing. If the site is not properly prepared when the Supplier arrives, the Customer bears all costs of the wasted journey.
16.2. The Customer is obliged to ensure that its staff provide the Supplier’s installation personnel with all necessary cooperation and information.
16.3. The Customer shall ensure that all licenses and official permits necessary for the installation have been obtained by the time of installation.
16.4. For installation work, the price does not include: (a) groundwork, drilling, construction work; (b) connection to utilities; (c) securing the environment; (d) waste removal; (e) travel, accommodation and meals of the Supplier’s employees.
16.5. The Customer shall ensure that the Supplier can carry out the installation without interruption, with access to gas, water, electricity, heating, a lockable dry storage area and the required safety equipment.
16.6. The Customer bears the risk of damage caused by loss, fire or any other event to the Supplier’s tools, equipment and materials during installation.
16.7. The Customer is obliged to take out adequate liability insurance under Art. 16.6 and to present proof of it on first request.
16.8. If the Customer fails to comply with the above and this causes a delay in installation, the delivery period does not run during the period of delay.
16.9. The Product including installation is deemed delivered at the moment the Customer is enabled to dispose of the properly completed Product at the installation site; the warranty period also begins at that moment.
17. Governing law and dispute resolution
17.1. Any disputes between the parties shall be resolved primarily by mutual negotiation. If no agreement is reached, disputes shall be subject to the jurisdiction of the courts of the Slovak Republic, with the District Court Malacky having local jurisdiction (or the court having subject-matter and local jurisdiction according to the Supplier’s registered office).
17.2. The Contract and these GTC, including any questions concerning their existence, validity or interpretation, are governed by the law of the Slovak Republic, in particular the Commercial Code. The application of the UN Convention on Contracts for the International Sale of Goods (CISG, Vienna Convention 1980) is hereby expressly excluded.
17.3. The governing version of these GTC is the English version. Any translations into other languages (including Slovak and Russian) serve for convenience only, and in the event of a discrepancy the English version prevails.
18. Force majeure
18.1. The Supplier is entitled to suspend performance of its obligations if it is temporarily prevented from performing by circumstances of force majeure.
18.2. Force majeure includes, among other things, failure of supplies from subcontractors or carriers, adverse weather conditions, earthquakes, fire, failure of energy supplies, loss, theft or destruction of tools or materials, road blockades, strikes and import or export restrictions.
18.3. If the force majeure obstacle lasts more than six months, both parties are entitled to withdraw from the Contract in relation to the affected part of performance; this withdrawal is one of the cases provided for in Art. 13.1.
18.4. If, as a result of force majeure, performance has become permanently and completely impossible, this is one of the cases of withdrawal provided for in Art. 13.1; in such a case both parties are entitled to withdraw from the Contract in relation to the affected part of performance, following the procedure under Art. 19.1. The other consequences under Art. 18.5 are not affected.
18.5. Neither party is entitled to compensation for damage caused by the interruption of work or by withdrawal from the Contract due to force majeure.
18a. Sanctions and export control
18a.1. The Supplier is not obliged to perform the Contract or any part of it if performance would require a breach of applicable regulations of the European Union or other international regulations on export control, trade sanctions or embargo measures (including in particular EU Council regulations, UN Security Council resolutions or applicable national legislation). In such a case the Supplier shall inform the Customer without undue delay and is not liable for any delays or non-performance.
18a.2. The Customer represents and warrants that it is not subject to any sanctions and that the subject of delivery will not be used in breach of any applicable export control regulations. The Customer shall indemnify the Supplier for any loss, liability or costs arising from a breach of this representation.
18b. Personal data protection
18b.1. The Supplier processes the personal data of the Customer’s contact persons to the extent necessary for the conclusion and performance of the Contract, in accordance with Regulation (EU) 2016/679 (GDPR) and the relevant legislation of the Slovak Republic. Detailed information on the processing of personal data is set out in the separate document “Privacy Policy” published on the website www.gastroprocessor.com.
19. Service of documents
19.1. Service of documents (other than by electronic communication) means delivery by registered post with acknowledgment of receipt, by courier or in person. A document is also deemed delivered if the party refuses to accept it, if the collection period at the post office expires, or if it is marked “addressee has moved” or similar.
19.2. In the case of service by electronic communication, a document is deemed delivered at the moment it was displayed in the addressee’s e-mail client and confirmed by an automatic delivery confirmation.
20. Final provisions
20.1. The Supplier may change or replace these GTC. The change is published on the website www.gastroprocessor.com, together with the date from which it takes effect.
20.2. The Contract is governed by the version of the GTC valid on the day the Quotation was accepted or the order was submitted.
Summary of key terms
| Term | Value |
| Delivery term | EXW Malacky, Slovakia (Incoterms 2020); promotion within the EU: free courier transport, risk borne by the Customer (Art. 10.5) |
| Payment | 100% in advance: via the payment gateway on the website or by advance invoice |
| Warranty | 12 months (6 months for continuous operation) |
| Governing law | Law of the Slovak Republic, Commercial Code; CISG excluded |
| Contract type | Section 409 (purchase) / Section 536 (contract for work), under Art. 1.3 |
| Customer’s right to withdraw | if the Supplier’s delay exceeds 270 working days (Art. 13.2) |
| Price adjustment | if costs rise by more than 8% (Art. 5.3) |
| Governing version | English |
FTP Engineering s.r.o. · Pezinská 5104, 901 01 Malacky, Slovakia · Company ID: 35977558 · www.gastroprocessor.com